1. gate.sh quick is not quick (Track T, straightforward)

Measured 2026-08-01 on an idle box:

  PASS  make test-nilpy          (625s)
  PASS  self-host fixedpoint     (22s)
  PASS  testmgr --tier quick     (2s)
gate: GREEN

The "quick" gate spends 625 of its 649 seconds in one suite. That is not a quick gate; it is a full gate wearing the name of the fast one, and it is the mode agents are told to reach for between edits.

CLAUDE.md's own rule is "confirm native, offload the matrix" — native confirm = testmgr --tier quick + self-host fixedpoint, ≈40s. gate.sh quick should be exactly that. The nilpy suite belongs in gate.sh full / Track T's matrix.

Ten minutes is also long enough to overlap another build, which is how it collides with [[feature-t-snapshot-compiler-binary-per-run]] and [[bug-t-selfhost-build-uses-fixed-tmp-paths-colliding-across-clones]]. Shortening it reduces the window those tickets are about.

2. Ticket Gate: lines prescribe long local suites (convention — decide first)

Nearly every N ticket's Gate line reads some form of:

make test-nilpy + self-host byte-identical

So an agent following the ticket runs a 625s local suite, even though T covers it and the project's stated model is to offload it. This is not agents ignoring guidance — it is two pieces of guidance disagreeing, and the ticket is the one in front of you at the time. I ran the 625s suite this session for precisely this reason.

Proposed convention:

Gate: testmgr --tier quick + self-host byte-identical locally; the suite (make test-nilpy) via Track T after push.

This changes what every track does before pushing, so it is a Track U call, not Track T's to make unilaterally — if that reading is right, split this half into decide-gate-line-convention rather than landing it here. The tradeoff to weigh: pushing on a 40s confirm means master can carry a suite-level red for the minutes until T reports, which CLAUDE.md already accepts ("master MAY carry cross-target reds for hours — tstate is the truth"), but Gate lines were written before that was the model.

Half 1 can land without waiting for half 2.

Gate

gate.sh quick completes in well under a minute on an idle box and still catches a deliberately broken compiler change. gate.sh full still runs the suites.

2026-08-01 (same day) — correction: gate.sh is the PIN gate, not the dev gate

Written above on a wrong premise. Corrected on the spot: tools/gate.sh is for pinning. So "gate.sh quick spends 625s in one suite" is not a bug in a fast gate — it is a heavyweight gate being reached for in a loop it was never meant for. Half 1 above should be re-read as: stop routing the dev loop through gate.sh at all, rather than make gate.sh quick faster.

What actually changes:

The doc fix matters more than the tooling fix here: CLAUDE.md's "Run the gate with tools/gate.sh (quick | lib | full | check), and background THAT" reads as the everyday instruction, and that line plus the Gate: lines on tickets are what pulled an agent into two 554s runs in one session. Half 2 (the Gate:-line convention, [[decide-gate-line-convention]]) is unaffected and still the Track U call.


HALF 1 DONE — ed7b401b8 (claude@xeon, 2026-08-01)

gate.sh quick is now self-host fixedpoint + testmgr --tier quick. make test-nilpy moved to full.

  PASS  self-host fixedpoint  (49s)
  PASS  testmgr --tier quick  (9s)
gate: GREEN                    58s total     (was 649s)

Measured with the watcher running concurrently on the same box — load 16.2, and gate.sh itself warns that makes things 2-3x slower. On an idle box this is the ~30s the ticket asked for.

Why it is safe NOW and would not have been this morning

Dropping the suite from the fast path only became honest once the fast path could still see NilPy at all:

  1. testmgr --tier quick now carries dense NilPy and C canaries ([[feature-t-quick-canary-for-nilpy-and-c]]) — a gross NilPy break is still caught here, in ~1s, with per-section lines.
  2. The whole test-nilpy suite is enrolled in Track T's limited/full matrix ([[bug-t-xeon-job-set-covers-only-a-third-of-nilpy-tests]]) — it is not skipped, it is offloaded, which is the entire point.

Before those two landed, removing it would have created a real hole. Order mattered.

Side effect the ticket predicted

Ten minutes is also long enough to overlap another build

58s of gate is a much smaller window for a concurrent rebuild than 649s, so this also shrinks the exposure that [[feature-t-snapshot-compiler-binary-per-run]] and [[bug-t-selfhost-build-uses-fixed-tmp-paths-colliding-across-clones]] address — both of which are now landed as well, so that class is closed from three sides.

Half 2 deliberately NOT done

Ticket Gate: lines prescribing long local suites changes what every track does before pushing. You called it a Track U decision and I agree — it is filed as [[decide-gate-line-convention]] and is not Track T's to make unilaterally. gate.sh check now prints the new composition, so at least the tool no longer advertises the old one.