What x86-64 baseline does pxx target?

DECIDED by the user, 2026-08-19: x86-64-v2.

"For purely pragmatic reasons I say V2. Having V1 is maybe a future compiler target but it's like 0.001% of active CPUs, whereas V2 is real and active. No-one uses that 1GHz first-generation AMD box."

What this settles:

  • v2 is the compiled baseline. SSE4.2/popcnt may be assumed.
  • v1 is not ruled out forever — it is demoted to a possible future TARGET, not the baseline. Recorded that way deliberately: "we chose v2" and "v1 is impossible" are different claims, and the second would be wrong. If a v1 build is ever wanted it becomes a reduced/alternate target, which composes with [[feature-a-build-a-reduced-compiler-by-selecting-frontends-and-targets]].
  • Anything above v2 is runtime dispatch, not a baseline bump — which keeps the one-way door shut, since raising a compiled baseline later breaks every user below it.

And it keeps the gate executable, which was the hard constraint: plexus, the box that gates every push, is Ivy Bridge — AVX but no FMA, i.e. exactly v2. A v3 baseline would SIGILL on the machine that verifies every commit. The pragmatic answer and the infrastructure answer coincide here, which is worth noting because they often do not.

Work re-filed into Track A (the O lane) — the feature ticket is unblocked.

Split out of [[feature-opt-arch-level-and-dispatch]] 2026-08-19, second use of the "blocked on judgement, not on engineering" outcome from the A/P/C feature triage. The feature ticket says it in its own words: "The baseline row is the user's call, not an engineering one." Left typed as a feature it reads as buildable, and whoever claims it has to guess a baseline the project cannot un-choose — raising a baseline later breaks every user on older hardware, so this is a one-way door.

The constraint that shapes the answer, measured

plexus — the box that gates every push — is Ivy Bridge: AVX, but no FMA. That is x86-64-v2. So a v3 baseline would SIGILL on the gate itself, not merely on some hypothetical user's machine. Any answer above v2 has to come with a plan for the gate box before it can mean anything.

This is the kind of fact that is cheap to establish and expensive to discover late, so it is recorded here rather than left in the feature ticket's body.

The fork

Roughly, the choices are:

Why it cannot be settled by an engineer

The trade is about who we are willing to stop supporting, which is a product question. A worker can measure the speedup of each level and cannot decide whether it is worth excluding older hardware — and the answer is not recoverable once shipped and depended upon.

Recommendation

v2 as the compiled baseline, because it is the highest level our own gate can execute, so it cannot silently break the thing that verifies every commit. Treat anything above it as runtime dispatch if it is wanted at all — which keeps the one-way door shut and defers the cost to the sites that actually benefit.

What happens after

Once decided, re-file the work into Track A (the O lane) and move this to decided/. ready/next do not read decisions, so a decision that is never re-filed is invisible and gets rediscovered.